Construction Elements | BCAD Culvert Crossing
15556
portfolio_page-template-default,single,single-portfolio_page,postid-15556,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-9.3,wpb-js-composer js-comp-ver-4.12,vc_responsive
Category
Underground Utilities
About This Project

BCAD Culvert Crossing

 

Location: Dania, FL

 

Owner (or Representative): URS

 

Work included cutting a two lane road east of FLL, installation of a 24-inch culvert, backfill using flowable fill, and repairing the road crossing with asphalt. The purpose of the new culvert was to allow storm water to flow from a collection basin to another section of wetlands.